Enviar mensagem
Casa ProdutosEncaixes de tubulação do aço da liga

Inconel 600 602 625 718 Alloy Steel Pipe Fittings SS Elbow Reducer Tee Cap

Certificado
China TOBO STEEL GROUP CHINA Certificações
China TOBO STEEL GROUP CHINA Certificações
Revisões do cliente
Na avaliação a mais atrasada do vendedor, TOBO ganhou a avaliação excelente, ele é bom, continuará a cooperar.

—— Brasil---Aimee

A tubulação de aço de liga de ASTM A213 T9, qualidade estável, bom preço, serive excelente, GRUPO de TOBO é nosso sócio de confiança

—— Tailândia ---Dave Mulroy

Estou Chat Online Agora

Inconel 600 602 625 718 Alloy Steel Pipe Fittings SS Elbow Reducer Tee Cap

Inconel 600 602 625 718 Alloy Steel Pipe Fittings SS Elbow Reducer Tee Cap
Inconel 600 602 625 718 Alloy Steel Pipe Fittings SS Elbow Reducer Tee Cap

Imagem Grande :  Inconel 600 602 625 718 Alloy Steel Pipe Fittings SS Elbow Reducer Tee Cap

Detalhes do produto:
Lugar de origem: Shanghai (China)
Marca: TOBO
Certificação: ISO,SGS
Número do modelo: 001
Condições de Pagamento e Envio:
Quantidade de ordem mínima: 10pics
Preço: USD13-55/pics
Detalhes da embalagem: Caso de madeira
Tempo de entrega: 7 dias
Termos de pagamento: L/C, D/A, D/P, T/T, Western Union
Habilidade da fonte: 10000PICS/MONTH

Inconel 600 602 625 718 Alloy Steel Pipe Fittings SS Elbow Reducer Tee Cap

descrição
Número do modelo: Lb-310S Materiais: liga de aço
Técnica: forjado Conexão: Soldadura
Forma: Diminuição Código principal: Rodada
Normas: ANSI/ASME/RUÍDO/JIS/API /GB /ISO Escala do tamanho: DN15-DN2400 (1/2” - 96")
Tipos: 45 graus, 90 graus, 180 graus, LR, SÊNIOR Aplicação: gás natural, produtos químicos, construção naval e assim por diante.
Realçar:

butt weld pipe fittings

,

alloy pipe fittings

Inconel 600 602 625 718 Alloy Steel Pipe Fittings SS Elbow Reducer Tee Cap

 

1.Introduction

Inconel 718 bar precipitation sclerosis type of molybdenum alloy containing niobium, nichrome, under

650 ℃ has high strength, good toughness and has good corrosion resistance in high and low temperature

environment.The supply state can be solid solution treatment or precipitation hardening state.

 

2.Chemical composition

  Ni Cr Fe C Mn Si Mo Cu Co Al Ti Nb B P S
MIN 50 17         2.8     0.2 0.65 4.75 0    
MAX 55 21 Margin 0.08 0.35 0.35 3.3 0.03 1.0 0.8 1.15 5.50 0.006 0.01 0.01

 

3.Chemical property

θ/℃ 600 700 800 900 1000
oxidation date/(g/(m2·h)) 0.0176 0.0277 0.0351 0.0961 0.1620

 

 

4.character

• Ending machinability

• Low at 700 ℃ has high tensile strength, fatigue strength, creep strength and fracture strength

• Low at 1000 ℃ has the high oxidation

• Both ends have stable chemical properties at low temperature

• Ending with good welding performance

 

5.Physical property

Density:ρ=8.24g/cm3

Melting temperature range:1260~1320℃

 

carbon steel cross tee

ABOUT US

 We are one of the Professional manufacturers Exporter  Pipeline products  in China .Our company was established in 1998, the plant covers 550, 000 square meters and a construction area of 6,8,000square meters, existing 260 workers and 45 technicians. We have five branch factories which can supply the best quality pipes, tubes, fittings flanges and related accessories.

 
Our Advantages
 

WHY CHOOSE US

TEAM

More than 120 top-class mills

EQUIPMENT

A number of advanced equipments

QUALITY

Company with a variety of detection devices

FACTORY

We have five branch factories

If the quantity of order is not very big,we could send them to you by express delivery,such as TNT,DHL,UPS OR EMS etc.

If order is big ,we will advise you use Air Shipping or Sea Shipping through your nominated forwarder agent.Our long-term cooperated agent also available.

FAQ

FAQ

1.  Are you trading company or manufacturer ?

We are manufacturer ,You can see the Alibaba certification.

2. How long is your delivery time?

Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

3. Do you provide samples ? is it free or extra ?

 Yes, we could offer the sample for free charge but need pay the cost of freight.

4. What is your terms of payment ?

Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.

 
Packaging&Shipping

Package:Standard export carton packing.

Delivery time:stock-45 days after confirming order,detail delivery date should be decided according to production season and order quantity.

 

carbon steel cross tee

Contacto
TOBO STEEL GROUP CHINA

Pessoa de Contato: Ms.

Telefone: 13524668060

Envie sua pergunta diretamente para nós (0 / 3000)